Rabat
Home / Projects / Rabat
Under construction · handover Q3 2028

Rabat

A home that breathes with you

CityBishkek
Address10 Matrosov St.
HandoverQ3 2028
Apartments1–4 rooms, from 45 m²
About the project

The quiet heart
of Bishkek

Two towers a five-minute walk from Vefa and Tash-Rabat, next to Dzerzhinsky Park. Supply ventilation with filtration, purified soft water in every apartment, enhanced sound insulation and a car-free courtyard.

  • 5 minuteson foot to Vefa and Tash-Rabat
  • ParkDzerzhinsky — morning runs and walks with the kids
  • 3 schools and 4 kindergartenswithin walking distance
  • 25+ cafesin the area, with Giraffe just across the intersection
Health at home

Engineering you
feel every day

Clean air

Supply ventilation with multi-stage filtration — fresh air even with the windows closed.

Soft water

Purified soft water is delivered to every apartment.

Quiet

Enhanced sound insulation and a gated territory — the city stays outside.

Fitness for residents

A private studio with modern equipment, open to residents only.

Parking with a lift

Two-level parking — no cars in the courtyard.

A safe courtyard

A playground under video surveillance and stroller rooms.

Lobby

From the doorstep —
already home

Natural shades of stone and wood, panoramic glazing, mirrors and soft light. A waiting area with armchairs for guests.

Choose an apartment

Floor, apartment, layout

Rabat, Block A facade
Block Bon sale soon
Block A
Block A

Floor 6

AvailableReservedSold
Typical floor plan, Block A

Demo Layouts and areas are real; prices and statuses are indicative. Once Profitbase is connected, this will show the live availability chart.

    Reserve on WhatsApp →

    A sales manager will check the current price and availability and reply during business hours.

    A gift

    A free design project
    for your apartment

    You save on a designer, avoid renovation mistakes and get precise drawings and specifications. Utilities, materials and storage are thought through in advance.

    Construction progress

    The site
    from a drone’s height

    Reinforcement and concreting of the frame on Matrosov St. We publish new footage on Instagram at @amanat_city_bishkek.

    1. June 2025Excavation
    2. September 2025Foundation
    3. February 2026Walls
    4. April 2026Block A frame
    5. Q3 2028Building handover

    Stages from site photos; last update: April 2026.

    0% installments

    What you pay per month

    Monthly payment
    Pay now
    Remainder in installments
    Overpayment0 KGS
    Get the payment schedule →

    Example calculation, not an offer. Ask the sales office for each project's terms.

    Location

    10 Matrosov St.

    Get directions in 2GIS ↗